TR EN

Garabekewul Ginning, Delinting and Acid Delinting Factory

Project Details

ESTABLISHMENT: June 2015

CAPACITY: 40.000 Ton Seed Cotton Per Year

LINT CAPACITY: 0,52 Ton/Hour for the First Cut - 0,38 Ton/Hour for the Second Cut

TOTAL AREA: 29.000 m2 Closed Area

PRODUCTION DAYS/YEAR: 150 Days/Year

PRODUCT RANGE

The Lint that leaves on the seed cotton is cut by first cut and second cut. For the first cut, the percantage is % 6 and the second is % 3 cut.

DELINTING PROCESS

The Lint that leaves on the seed cotton is cut by first cut and second cut. For the first cut, the percantage is % 6 and the second is % 3 cut.

ACID DELINTING PROCESS

For planting purposes, the seeds are extracted from all foreign materials and left zero lint on the seed. All immature seeds and stones coming from cotton fields are eliminated by screening system. It also permits the selection of healthy embryos of the same size. Certain degree of quality of cotton seeds in suitable weights are only selected during this process. As a result, strong, healthy, high productive seeds are packed in 20 kg paper bags for the farmers.

MACHINERY

Bc Supply, USA Origin, Ginning Part
Cantrel Worldwide, USA Origin, Delinting Part
L.T Kincer, USA Origin, Acid Delinting Part
Signode , USA Origin, Automatic Bailing System
Bc Designed, Turkish Origin Bale Press


Warning: include(parallax-hourse.php): failed to open stream: No such file or directory in /home/engingru/public_html/13.php on line 118

Warning: include(parallax-hourse.php): failed to open stream: No such file or directory in /home/engingru/public_html/13.php on line 118

Warning: include(): Failed opening 'parallax-hourse.php' for inclusion (include_path='.:/opt/cpanel/ea-php56/root/usr/share/pear') in /home/engingru/public_html/13.php on line 118